Fiscal Year 2013-2015 Special Budget Meeting
Informational ReportFiled under council matter 12-0351
Subject: Fiscal Year 2013-2015 Special Budget Meeting From: City Administrator's Office Recommendation: Receive A Presentation And Hold Discussion On The Mayor's Proposed Budget For Fiscal Year 2013-2015
Extracted text
Proposed CIP
Page 8
Minor Capital Improvements, which would fund repairs or replacement of assets that are
not planned but are of an urgent nature, are recommended for funding in the proposed
policy operating budget. These include roof repairs and replacement; hot water heater,
chiller and boiler replacement; appliance replacement; mold, asbestos and lead paint
abatement; HVAC major repair and/or replacement; Fire Station apron replacement;
electrical panel upgrades; sewer line/lateral replacements; interior plumbing replacement
at aged facilities (e.g. PAB); various facilities –fire and burglar alarm system upgrades;
Parks and Recreation Tot Lot surface replacement; Fire Station roll up door replacement;
Parks and Recreation swimming pools, pumps, boilers and filters; fencing at a variety of
facilities; pathway and parking lot paving at all facilities; Ball field and park lighting.
The category is listed here for consideration should funding for this work be removed
from the proposed operating budget.
Other Unmet Requests
This category includes all other department requests for capital projects. These include
completion of some or all of the Library Master Plan; improvements to Recreation Centers and
Parks; construction of New Fire Stations and upgrades to facilities throughout Oakland.
Next Steps ‐ Long Term Planning
Because capital assets are linked directly to services provided by the City organization, any long
term capital project planning requires a careful assessment of core services. In seeking input
from departments for the preparation of this CIP, it became clear that the requests for capital
investment vastly outweigh our capacity to fund them. Oakland maintains a significant
inventory of assets, from the street and sidewalk network to buildings, grounds and facilities.
Many of our assets have reached the end of their useful life and need replacement. Others have
historic value or other intrinsic value to the community. Our inventory also includes facilities
that have been abandoned, are no longer used for their original intended purpose or are
functionally obsolete. Abandoned assets in particular pose an ongoing maintenance burden and
often present liability to the City.
Before any significant investment can be made to these assets, a prioritization must be
completed. Such prioritization must take into account the current condition and the current and
future need and use. It must include a risk assessment, an analysis of the highest and best use of
each asset, and a cost-benefit analysis to maintaining ownership and use. Finally, it should
consider all options to deliver the service associated with the asset.